top of page
Alberco - Bridge demolition and reconstruction Firebag River, AB
Cranes and excavators were required on the river to assist with tear down and setting new bridge girders. Time was against them when they called us to help build ice faster. Our high pressure spray ice rig was deployed to site, where we built up the ice thickness as required in 4 days.
bottom of page